Series 3

Series 3 88″

1982 2.25D

Price

This exact car was £60,000

Built Q4 2024.

       The owner of this vehicle wanted the “ultimate wolf in sheep’s clothing” and that is exactly what he got. So what looks like a patinaed, rusty old Land Rover on the outside, is actually the fastest Land Rover we’ve ever built and most likely the fastest Series Land Rover on the planet. Underneath it boasts all new running gear, axles, brakes and suspension, a galvanised chassis, and of course our land rover electric conversion package. Inside are torn seats, a ripped dash and no floor mats! The owner now blasts around the lanes of Cornwall, bringing a smile to his face with every bend.

Acceleration (0-60)

5 Seconds

Power

280 Horsepower

Range

150 Miles

Range Rover

Land Rover Series 3

Short wheel base county back

 

Specifications

Electric ConversionOriginal Diesel Engine
Power280 Horsepower62 Horsepower
Acceleration (0-60mph)5 Seconds> 20 Seconds
Emissions0> 5 Tonnes of CO2 per annum
Battery55kWh
ChargingCombined AC and DC Charging
Range150 Miles

Drivetrain:

  • A Tesla Model 3 motor is longitudinally mounted in the gearbox tunnel, sending drive to front and rear differentials which maintains constant four-wheel drive. These motors are up to 280 horsepower and eliminate the need for an original gearbox or transfer box.
  • The Tesla motor is completely rebuilt with new internal gear sets, bearings and oil, a new limited slip differential, output shafts and an Ingenext control system.
  • Although unavailable new, using the Tesla Model 3 motor gives us complete confidence in reliability and engineering design from the leading OEM electric vehicle manufacturer. We no longer use the Tesla Model S motor due to far inferior efficiency and reliability, as well as being a far older design.
  • The control system is built by Ingenext in Canada and allows for connection to a mobile app to adjust power modes and throttle sensitivity.

Battery Pack:

  • 55kWh of brand new S-Volt (European) batteries are mounted in an engine bay mounted Universal Battery Pack, manufactured by Fellten in Bristol, UK.
  • Fellten are clear market leaders in EV battery pack technology. They produce high numbers of OEM quality battery systems which are shipped worldwide and conform to various regional regulations and standards.
  • By utilising the Fellten Universal Battery Pack we can offer a very high quality, robust battery system backed by a 3-year manufacturer warranty, this would be very complex to produce in-house. More information is available on their website.
  • Batteries run at 400 volts, are water cooled and monitored using state of the art battery management systems and safety software, built into the battery box and managed solely by the Fellten software team.

Charging:

  • Charging is possible from any EV charge point, as well as from a 3-pin plug at home, both Type 2 (Europe) and Type 1 (USA) sockets are available.
  • Super fast DC charging allows for a 45 minute full charge, with a 0-80% time of around 25 minutes. This is only available from CCS public charge points such as those at service stations and petrol stations.
  • Standard AC charging allows for an 8 hour full charge, these chargers can be installed at home or are often found in carparks or on lamp posts.

Further Information:

  • Axles and brakes have been rebuilt to allow for permanent 4WD and the high power motor. 
  • Gauges have been swapped for custom made dials, showing speed, current, temperature, and state of charge.
  • A 3kW heater provides cabin heating through original ducting.

 

Land Rover Conversion
Land Rover Conversion
Land Rover Conversion
Land Rover Conversion
Land Rover Conversion